Our Services

Engineering Design

With the experienced resources, we will give you advise on any engineering design. Our resources have engineering design experiences in many reputable companies.

Procurement Support

Our team would like to support you to select the best material which meets your requirements. Our support will ensure that selected material will fit with the site requirements.

Construction Support

Any obstacles occurred during construction involving constructability/SIMOP, our team would like to listen to it, even visit your site to get better understanding.

Responsiveness

We shall give you respond to any of your requirements and give the solution in the promised time frame. Or even faster.

Testing, Commissioning & Start Up

When testing, commissioning & start up is coming, our team would like to assist you & supervise the whole process.

Others

With many necessities for the project -i.e. Process Safety, scheduling, HSE, QA/QC-, we also offer the solution who will support you executing the project.

Latest Works

  • All
  • Onshore
  • Offshore
  • Utility

We love to help you in the engineering design & project management support.

Project List

testi

Installing new Jockey Pump @ 150 gpm & 2 fire water pumps @ 5,000 gpm includes the new structure platform, diesel tank @ 1,200 gal. & PLC upgrade to monitor & control the fire pumps.

Chevron Pacific Indonesia

Dumai Tank Farm - Fire Water Pump

testi

As part of Company's CSR the 2.1 km road access to MB2 station upgraded into concrete pavement road includes the reinforcement of the crossing bridge abutment.

PHE - ONWJ

MB2 Road Access Improvement

testi

To install 10” duplex pipeline from new well, 150 MMSCFD flowrate to Gas Plant. The project is developed in 2 stages, i.e. with temporary SRU & with permanent filters installed.

ConocoPhillips Grissik Ltd.

Sumpal 8 Wellsite

testi

The FSO Petrostar shall be replaced by FSO Ship 115 which function as the FSO & custody meter of condensate & crude produced from Jabung block before offloaded to buyer’s vessel.

PetroChina Jabung Ltd.

Ship 115

testi

To improve distribution line by changing the 2 stages of 115/44 kV/13.8kV line by replacing transformers into single 115/13.8kV, VR 44 kV into 13.8 kV. Install 2 VCBs, F60 & F35, RTU, DFR.

Chevron Pacific Indonesia

Bekasap Substation Improvement

testi

Prepare the KBD-2X wellpad area includes the Mud Pits, Shale Pit, Cellar Box & Drilling Rig Skid, Flare Pit, Chemical Storage, Fuel Tank, Water Supply Tank, Cement Silo.

Repsol Sakakemang

KBD2-X Wellpad Reentry

testi

Installing additional of the addressable detection system (smoke, flame & gas), F&G Panel & FACP at the CPP offshore platform & at the ORF area.

PHE WMO

F&G System Upgrade

testi

To install 12” pipe from Suban 24 well, tie in to existing Suban 11 Pipeline with 100 MMSCFD flowrate to Gas Plant.

ConocoPhillips Grissik Ltd.

Suban 24 Wellsite

testi

Installed CO2 Removal & Dehydration unit to improve the sales gas quality.

Pertamina EP Zona 7.

Karang Baru Gas Plant

Latest News

blog
20 Jun 2020 Adiwira

More News

More News is Coming.

blog
18 Jun 2020 Adiwira

Inquiry

We love to hear propsected project from you. Please send your inqury to info@adiwira.id

blog
15 Jun 2020 Adiwira

Career

We are looking for talented engineers & drafters. Please send your Info through

following link

Get In Touch

Drop Us a Line

We are here to answer your question you may have